Bestech Environmental Resources, Inc.
3053 Mountain View Way
Bessemer, AL  35020
office (205) 428-0210
fax (205) 428-0211


Animal Crematories


Bestech has been in the incinerator sales and service market for over 22 years. Because of our experience as a service company we know the need for a well designed, easy to use, and durable crematory. With this in mind we chose to represent Therm-Tec Manufacturing located in Sherwood Oregon. Their equipment is designed to be worry free, with little maintenance for years of "day in and day out" use.

Please Visit www.animalcrematory.com for more information on our units including specification, drawings, pictures, and unit sizing calculator.
Page will open in new window

Small Units

DESIGNED FOR: Small size animal control facilities, humane societies and universities with testing facilities. Up to 550 Pounds Per Day

Medium Units

DESIGNED FOR: Medium size animal control facilities, humane societies and universities with testing facilities. Up to 1,400 Pounds Per Day

Large Units

DESIGNED FOR: Large size animal control facilities, humane societies and universities with testing facilities. Up to 5,000 Pounds Per Day

Benefits of Therm-Tec Animal Cremation Systems:

  • Unique 12" to 27" loading height above floor, minimizes workers lifting of heavy loads; thereby reducing potential back injuries and subsequent worker's compensation claims.
  • Full diameter loading/cleanout door, provides full visual and service access to refuse chamber and facilitates the loading of the occasional large carcass into the chamber.
  • Unique design eliminates costly repairs associated with "hot hearth" designs. (hearth failure)
  • Batch loading, reduces operator exposure to heat and allows personnel to attend to other responsibilities while load is cremated.
  • Separate temperature controls for refuse chamber and control chamber (afterburner) automatically regulate burner to save fuel and facilitates efficient combustion of the waste, thus reducing operating cost.
  • Simple installation: Because units are pre-wired and pre-plumbed installation generally will take 1 day plus cure out.
  • Proven performance: over 1,500 units installed and operating.